Hospitality Furniture

Hospitality Furniture for Hotels and Serviced Apartments

Hotel casegoods and FF&E for guest rooms, suites and public areas: wardrobes, bedside units, mini bar cabinets, TV and luggage units, headboards and wall paneling, bathroom vanities, fire-rated doors, banquet chairs, conference tables and reception counters. One supplier for the full room set, with drawings, samples, inspection and export packing handled as a single hotel furniture procurement package.

Hotel and serviced-apartment projects live or die on the guest room. Yunlara builds the full guest-room package — beds and headboards, built-in wardrobes, bathroom vanities, luggage racks, TV cabinets, minibars and casegoods — from one coordinated supply chain instead of five unrelated vendors. Every item is made to your drawings and brand standard: board grade, veneer colour, edge banding, hardware brand and fire rating are specified in writing before sampling, then held constant through batch production. Typical hospitality orders run 30 to 300 rooms, with free pre-production samples, room-set packing lists and CIF or DDP delivery to the project site. Because the same factory set produces all furniture in a room, colour and dimension tolerances stay consistent across floors and phases, which is the single most common failure point in multi-vendor hotel fit-outs.

What Buyers Specify Before Sampling

Board grade, veneer species, edge-banding type, hardware brand and fire rating are written into the specification before a single panel is cut. Guest-room carcasses use 18 mm E1 board with moisture-resistant backing on units next to bathrooms; public-area seating uses contract-grade foam rated for daily commercial use rather than domestic foam. Where local code requires it — EN 13501-1 in Europe, BS 5852 in the UK, ASTM E84 in the US — fire performance is documented per item, not claimed once for the whole project.

Minimum Quantities, Lead Times and Payment

Standard guest-room casegoods start at 30 sets per model, and mixed-room projects are quoted as a single package. Production runs 15 to 30 days after drawing approval and sample sign-off, then 25 to 40 days by sea depending on the destination port. Typical hospitality orders cover 30 to 300 rooms. Payment is normally 30% deposit against the signed drawing set with the balance before shipment; CIF and DDP terms are available so the delivered price is known at quotation stage rather than discovered at customs.

Samples, Colour Control and Batch Consistency

A pre-production sample room set is built and signed off before the main run. That approved sample is photographed, dated and kept as the physical colour master, so every later batch is measured against a real panel rather than a screen image. Because one factory set produces every furniture item in a room, dimension and colour tolerances stay consistent across floors and delivery phases — the failure point seen most often when a project is split between five unrelated vendors.

Frequently Asked Questions

What is the minimum order quantity for hotel furniture?

Standard guest-room casegoods start at 30 sets per model. Mixed-room projects are quoted as one package, and single-room or prototype orders can be arranged at sample pricing.

How long does a hotel furniture order take?

Production runs 15 to 30 days after drawing approval and sample sign-off. Sea freight adds roughly 25 to 40 days depending on the destination port. Air freight is available for sample rooms and replacement units.

Which certifications do hotel buyers normally ask for?

Buyers typically require FSC or PEFC chain-of-custody for timber, E1 or E0 board grade for formaldehyde emission, and fire performance to EN 13501-1, BS 5852 or ASTM E84 depending on the market. Test reports are issued per item.

Can you match finishes from an existing hotel or another supplier?

Yes. Send a physical sample, a Pantone or RAL reference, or a photo taken under controlled light. A colour panel is produced for approval before the main run and kept as the batch master.

Do you deliver to the project site and handle installation?

We ship FOB, CIF or DDP and can deliver to site with room-numbered packing lists. Installation supervision can be arranged for larger projects; most orders are installed by the local fit-out contractor from the numbered kits.

How do you keep colour consistent across several production batches?

The approved sample panel is photographed, dated and stored. Each later batch is compared against that physical panel, and finish suppliers are locked for the project duration so tint and gloss stay constant.