Yunlara is a China-based custom hotel furniture manufacturer and OEM/ODM supplier supplying 4-5 star projects, fit-out contractors, wholesale buyers and procurement teams worldwide. We build full guest-room sets, wardrobes, casegoods, reception counters and banquet furniture to your room drawing, with samples sealed before production, third-party fire test reports, pre-shipment inspection and export packing handled as one package.
No trading-company markup. One factory covers the whole room set, from sketches and material samples to finished delivery, so you manage a single supplier rather than chasing separate vendors for cabinets, upholstery and doors.
XZ-HOTEL-001专为酒店工程项目设计的定制床头柜与床架套装,暖木色现代风格,坚固耐用,支持按项目批量定制尺寸与饰面。
View detail →
XZ-WARD-002整墙定制衣柜系统,玻璃门与木门组合,内部收纳分区灵活,适用于酒店套房、公寓与住宅工程。
View detail →
XZ-KITC-003现代模块化整体橱柜,白色门板配木色台面,石英石台面可选,适配酒店公寓厨房与工程项目批量定制。
View detail →
XZ-OFFI-004现代简约办公桌,木质桌面配钢架腿,带抽屉柜,适配商务办公空间整装项目。
View detail →
XZ-LOUN-005酒店客房与公共区域休闲单椅,灰色布艺配实木框架,人体工学设计,可整批定制颜色与面料。
View detail →
YW-W01迪拜酒店标准嵌入式衣柜, 工厂直供 OEM
View detail →
YW-W02酒店客房迷你吧柜, 内置冷藏位, OEM 定制
View detail →
YW-K01酒店卫生间洗手台柜, 防潮材质, 含台盆
View detail →
YW-H01酒店客房电视柜, 带行李架和托盘, 酒店工程定制
View detail →
YW-H02酒店客房护墙板+布艺床头板, 整房工程配套
View detail →
YW-H03酒店防火门 30/60 分钟, 中东酒店工程标准
View detail →
YW-O01酒店会议室桌椅套装, 折叠/固定两种, 工程配套
View detail →
YW-O02酒店宴会椅, 铝合金/钢架, 可堆叠, 出口中东
View detail →
YW-H04酒店前台接待台, 整幅石材/人造石, 定制Logo
View detail →
YW-W03酒店客房行李架, 折叠设计, 金属/木质两种
View detail →A direct manufacturer cuts the middleman layer that trading companies add between your order and the workshop. You send the room drawing, we quote material, hardware and labour in one line, and the same team that builds the units handles quality control before loading. Full room sets are produced under one roof, which keeps veneer, finish and fire rating consistent across hundreds of keys.
Upholstered panels pass EN 1021 and BS 5852 crib 5 fire tests; casegoods use E1 grade board to hold formaldehyde emissions under the EU and UK limits. Test reports are issued per batch so customs in the EU, UK and Middle East clear without a two-week hold. We do not quote on price alone; safety compliance and lead-time proof come first.
Every unit is built to your drawing: veneer grain, hardware grade and panel colour are sealed on a sample before mass production, so the bulk order matches the approved panel rather than a catalog photo. Custom depths, built-in wardrobes, mini bar cabinets and reception counters are sized per room, not stocked off a shelf.
For bulk orders of 200+ units the standard lead time is 35 working days from drawing approval to container loading; orders under 50 units run in about 22 working days. A 5-day QC buffer sits before shipment, and a fast-track schedule is available when an opening date moves up.
How bulk pricing, MOQ bands and container mix actually work before you ask for a quote.
Read guide →Vet capacity, quality control and export proof before you commit a deposit.
Read guide →What separates a real factory from a reseller on a sourcing trip.
Read guide →Landed-cost items buyers forget to budget before ordering.
Read guide →Why MOQ comes from veneer, lacquer batch and changeover, not the factory being difficult.
Read guide →The checks that protect your deposit before production starts.
Read guide →We are the manufacturer. Casegoods, wardrobes and upholstery are built in our own workshop, and we handle export documentation directly, so there is no trading-company markup between your order and the factory floor.
Yes. Every unit is built to your room drawing; veneer, hardware and fire rating are specified per project, and a sample panel is sealed before mass production so the bulk order matches the approved finish.
Yes. We produce to your own brand artwork and packaging for OEM/private label, and accept wholesale bulk purchase for multi-room projects; MOQ, sample plan and lead time are quoted per project.
Upholstered panels pass EN 1021 and BS 5852 crib 5 tests; casegoods use E1 board. Batch test reports are provided for customs clearance in the EU, UK and Middle East.
200+ units take 35 working days from drawing approval to container loading; orders under 50 units run about 22 working days. A 5-day QC buffer sits before shipment, with fast-track available for an opening date.
Yes: foam-protected export cartons, a loading plan, commercial invoice, packing list and required certificates are prepared before shipment so the container clears destination ports without rework.
Tell us the project scale, destination and required fire standard; we reply with material, lead time and a sample plan.
Request a Quote →