IllustrationA signed sample is the only document that settles a colour argument, and it needs three parts: a colour panel, a material sample and a finished assembly.
In short
- Approve a colour panel, a material sample and one finished assembly before mass production.
- Record the lighting condition, since a panel approved under factory daylight reads differently in a lobby.
- Keep the signed master for 12 months and compare every batch against it with a colour instrument.
Sample approval is where most hotel furniture disputes are decided, months before anyone sees a defect. When it is done properly, the factory has a physical reference and the buyer has a rejection right. When it is done by email with photographs, both sides have an opinion and nothing else.
In short: approve three physical items - a colour panel, a material sample at production thickness, and one finished assembly such as a door or drawer front. Sign and date them, keep one copy at the factory and one with the buyer, and hold them for twelve months after the last delivery.
Why is a photograph not a sample?
Because a photograph carries no gloss, no texture and no colour accuracy. Two panels can look identical on a phone screen and differ by 3 delta E under the lobby lighting. A photograph also cannot be measured. When the argument comes, the buyer says the goods are too red, the factory says they match the picture, and neither can prove anything. A physical panel under the same light settles it in five minutes.
What does the colour panel need to contain?
The approved finish on the actual substrate, at the actual thickness, in a 200 x 300 mm size minimum, with the client reference number written on the back. For natural stone or veneer, the panel should come from the production batch, not from a showroom sample. For a lacquered product, one panel per gloss level. Sign across the face and the edge so a swap is detectable.
What does the material sample need to show?
Edge banding at the production thickness, glued and trimmed, plus a cut edge so the buyer sees what the core looks like. On a plywood carcass the sample should show the core layers, since a buyer who thinks they are getting solid wood will otherwise find out at the site. If the specification calls for a fire rated assembly, the sample needs the intumescent seal in place.
Why approve a finished assembly?
Because joints are where the arguments live. A door front shows the gap to the carcass, the hinge pocket, the edge band radius and the finish at a corner. A drawer front shows the runner position and the reveal. Approving these two items before mass production removes about 80 percent of the visual disputes that would otherwise appear at handover.
How should approval be recorded?
A one page form per sample: project, item, factory, date, inspector, the standard clause it satisfies, the photo with a scale, and two signatures. Note the lighting condition used, because a panel approved under factory daylight and installed under 2700 K lobby lighting will read differently. Keep a copy in the project file and a copy with the goods.
What does the factory have to do after approval?
Retain the signed master, produce a comparison panel from every production batch, and measure against the master with a colour instrument where the project requires it, recording delta E and gloss. Any deviation beyond the agreed tolerance stops the batch before packing, not after arrival.
What belongs in the approval clause? 1. The three items to be approved and their sizes. 2. The lighting condition for approval. 3. Colour tolerance and measurement method. 4. Signature and retention period. 5. Batch comparison requirement. 6. What happens if a batch falls outside tolerance.
The limitation: a signed sample cannot cover everything. It proves a colour, a texture and a joint, not a structural performance. Load tests and fire certificates still have to be documents, not samples.